Can I have a running clock time in a Google spreadsheet?

Post date: 2019-09-13 09:57:05
Views: 237
I'm planning an event in a Google spreadsheet. I've set it up so the durations column always totals- that way I can ensure that the whole event is 120 minutes long, even as individual segment lengths change. Question: I also want a column where I can input a clock start time of, say, 3:45pm, and have the CLOCK start time of each segment automatically correct itself as I adjust the segment lengths. Is this possible?
Number of Comments
Please click Here to read the full story.
 
Other Top and Latest Questions:
UBS turns bullish on Palantir, says buy the dip on this clear AI winner
Noise cancelling headphones, overstimulated parent edition
French old patterns on newspaper print?
Robust Search within recovered data
Answered: Can I upload video in q2a by a plugin?
Movie: The Other Me
Movie: Apartment 7A
Special Event: MetaFilter Board Town Hall
Anthropic faces lose-lose scenario in Pentagon conflict as deadline for policy change looms
U.S. and Iran wrap up 'most intense' nuclear talks with no deal — more negotiations ahead